I am going to be applying “the mix” to some of my wood soon. I know proportions but cannot remember time frame. How long should I wait between coats? Consider the average temp is about 70 right now.
Sent from my iPad using Tapatalk
Melle.17 wrote:I am going to be applying “the mix” to some of my wood soon. I know proportions but cannot remember time frame. How long should I wait between coats? Consider the average temp is about 70 right now.
Sent from my iPad using Tapatalk
So basically I do the first thinned with 50 followed immediately with 75 then immediately with full poly? No need to wait between applications?tony.latham wrote:Melle.17 wrote:I am going to be applying “the mix” to some of my wood soon. I know proportions but cannot remember time frame. How long should I wait between coats? Consider the average temp is about 70 right now.
Sent from my iPad using Tapatalk
You don't. You want the wood to soak in as much as possible.
Some folks mix it as thin as 25% poly. When I use it, it's mixed at about 50% and finished off after drying with a coat of 100%.
But for really sealing the deal with wood... I use epoxy.
Tony
No need to wait between applications?
Pmullen503 wrote:If you can smell the solvent, it's not fully dried.
I went with 25%, then 50%, then 75%, and 100% a day between coats and maybe a week after the last coat the solvent smell was gone.
Return to Trailer and Chassis Secrets
Users browsing this forum: No registered users and 3 guests