20180825 092153 (Small)

20180825 092153 (Small)


Mon Aug 27, 2018 2:34 pm
105

EXIF-Data

Sat Aug 25, 2018 8:21 am
4.2 mm
1/30 Sec
F/1.7
160
Auto
Flash did not fire
Normal program
0 EV
Pattern
GrantRobertson
Teardrop Inspector
 
Posts: 16
Images: 25
Joined: Fri May 25, 2018 12:18 pm

Image Description

In the process of building the frame for the right side wall. I drew up a full-sized plan, right on the floor itself, then built the wall right on top of that plan. It is only clamped upright for now to check alignment.

Return to Camper-01 - Build