20210320 194706

20210320 194706


Fri May 28, 2021 4:17 pm
19

EXIF-Data

Sat Mar 20, 2021 6:47 pm
4.3 mm
1/60 Sec
F/2.4
100
Auto
Flash did not fire
Normal program
0 EV
Center-weighted average
User avatar
Hotrod70
Teardrop Inspector
 
Posts: 4
Images: 38
Joined: Fri May 28, 2021 12:55 am
Location: Tennessee

Image Description

I put two layers of 1/4" luan down between the first rib and the last rib. I finished it off to the front and rear with onloy one layer so the metal would lay correctly.

Return to Haulmark 7x14 CTC build