Grummy-TNT
Senior Member
- Joined
- Jul 20, 2005
- Posts
- 222
>>>>Will do the sides before we pull the bottom 3/4" ply.....
If you are going to insulate the floor, it is easier from the top when the floor is out if you ask me. You can get better measurements because your not crawling around underneath. I cut mine to be snug, laid a bead of adhesive on the inside edge of the frame and floor joists, pressed the PolyIso down and flush with the top of the joists. Right before I dropped the flooring section back in place, a dropped few dabs of adhesive here and there on top the PolyIso to get it to stick to the underside of the flooring.
I put the silver side down under the floor, and did still need to caulk all the way around the lower edge, but at least I only had to be laying under there for have the time.
If you are going to insulate the floor, it is easier from the top when the floor is out if you ask me. You can get better measurements because your not crawling around underneath. I cut mine to be snug, laid a bead of adhesive on the inside edge of the frame and floor joists, pressed the PolyIso down and flush with the top of the joists. Right before I dropped the flooring section back in place, a dropped few dabs of adhesive here and there on top the PolyIso to get it to stick to the underside of the flooring.
I put the silver side down under the floor, and did still need to caulk all the way around the lower edge, but at least I only had to be laying under there for have the time.



could leave them open a little to let the heat escape.
allows

