TimC-TNT
Senior Member
- Joined
- May 23, 2015
- Posts
- 1,472
Due to the heat and humidity this weekend I'm tackling some jobs that take me to the cool basement workshop. I've made treated lumber spacers to mount the fenders to the frame. I also laminated and machined the mating pair of 1 1/2 inch maple to mount on top of the bulkhead that will eventually hold the hatch hinge. One half is mounted securely to the bulkhead and the other half is the hatch top frame member that will anchor the hinge.
I put another layer of spackle on the interior walls. That is going slowly. Several coats have taken days to harden up with the intense humidity we are having. Very humid days were rare up here until the last year or two. Something is going on for sure. We usually "enjoy" a stretch of several weeks of dry spell in late July and early August. This and last summer there is no sign of drought. And the mosquitos! They are usually gone by August except in the deep woods.
Another task I could handle easily without Andy is plywood facing for the galley. I just happen to have a decent piece of 1/2" ply (thanks Menards for always packaging my lauan shipment with useful materials!). First I made a cardboard template for the port and starboard sides.
Transfer that to my ply.
Add a 3/8" "gutter" to keep water out.
Fits! Now adding some stretigic pocket holes to anchor it to the floor and bulkhead. I'll also glue the ply to the foam.
Next up is finish spackling and scratch the foam to prep for PMF. I must remember to make a legend for the locations of cleats and wires before we cover everything up with PMF! More on that in a later post.
I put another layer of spackle on the interior walls. That is going slowly. Several coats have taken days to harden up with the intense humidity we are having. Very humid days were rare up here until the last year or two. Something is going on for sure. We usually "enjoy" a stretch of several weeks of dry spell in late July and early August. This and last summer there is no sign of drought. And the mosquitos! They are usually gone by August except in the deep woods.
Another task I could handle easily without Andy is plywood facing for the galley. I just happen to have a decent piece of 1/2" ply (thanks Menards for always packaging my lauan shipment with useful materials!). First I made a cardboard template for the port and starboard sides.
Transfer that to my ply.
Add a 3/8" "gutter" to keep water out.
Fits! Now adding some stretigic pocket holes to anchor it to the floor and bulkhead. I'll also glue the ply to the foam.
Next up is finish spackling and scratch the foam to prep for PMF. I must remember to make a legend for the locations of cleats and wires before we cover everything up with PMF! More on that in a later post.

