eaglesdare
Senior Member
- Joined
- Aug 26, 2008
- Posts
- 3,168
ok that did not work, hold on
.
. I'll just leave them in here with hope that things will work themselves out eventually. Check my album/gallery to see latest pics.
KCStudly":35xtgfx4 said:Thank you Sharon, with your input I was able to go back and fix the pic's in my last couple of posts.
Is this "_page" thing something to do with the new forum or did I just do something new/wrong? I Had no trouble putting up pics previously.![]()
Leaves no doubt as to intent ...
). Given the doubled up spars at the vent opening, the structural nature of the cabinet frames, and combined with the "stressed skin" ceiling panel I am hopeful that it will not collapse with heavy snow loads in the event that it gets dumped on here in New England.
It "looks about right" to me and is certainly not any, if very far, off from many others seen here.



soon. The piece of scrap steel I had for the little caps was easier to rip up on the large vertical bandsaw at work, than it would be to do at Karl's shop. He's got cut off saw, very large Marvel vertical band, plasma cutter, abrassive cut off wheels, etc., etc. His little cut off band saw can even be converted into a vertical saw with small table, but the 16 inch saw at work has a nice big cast table and a rip fence attachment, so that's what I did after work today. That and a little more detailing on the floor assembly drawings. Have to work out a few details in the "glue & screw" schedule to make sure that any fasteners holding the floor subframe together don't interfere with the later attachment of the walls. Had thought about using plate (biscuit) joinery for the floor frame, but that has some down sides to it, too. I think I can squeeze all of the screws in and have them be happy together, but it will take careful and accurate layout. Complicating matters slightly is the fact that the side rails of the floor subframe will be 1x on edge, so the fasteners on the insides holding the walls to the floor will have to be strategically located to land in the larger 2x floor xmbrs and the corner blocks where the floor anchors to the trailer frame. The screws on the outside of the wall will go through the base plate of the wall and into the 1x edging using a Kregg, so those can be located along the rails anywhere along their length. So for the narrow 1x on edge floor xmbrs I can screw straight through the centers from the outside, but on the 2x floor xmbrs I will place the screws holding the rim rails on towards the front half of these xmbrs, and the screws on the inside of the walls will be aimed down into the back halves of these larger targets. Seems like a lot of details, and potential error to save a little bit of weight, but everything is a compromise. I want the full perimeter steel frame that is tough enough to bottom out on a rock or three, but will try to win back that non-ultra light weight feature by being crafty in other areas. Planning and details I got covered!!
(light weight, probably not so much.)
)
Even though the tube came in 24 ft lengths instead of 20s.
)