Where were we? Ah yes...
The longer pieces are a little different, so I laid out and prick punched the intermediate xmbrs.
Change the alignment fixture around to a fence, place the long angle against fence, unlatch the punch arbor from the hydraulic ram, lower the punch pin point into the prick punch mark, step on the pedal and the ram catches up to the punch, pop goes Bob's your uncle, hold the pedal down, latch the punch arbor to the ram head, lift the pedal, and the std stripper does the rest. Both xmbrs took less than 3 minutes to punch 8 holes.
On to the main frame rails. Cutting to length. (Actually 3 cuts: first piece rough cut, second piece cut to length, 3rd square off the mushroomed end of the first piece by cutting to final length. Less moving the big pieces around that way since I had already laid the whole stick up into the saw and there was not enough run out to nip the end off first.)
Close up of the saw at work. Ho hum.
Actually, it's a very nice precision little Italian made saw (albeit a little used at this point...lots of miles under this one). Both the intermediate xmbrs and main rails (with careful attention to measuring and positioning in the saw) came out perfectly square and exactly equal to each other in length. Huzzah!
So I didn't really check the clock, but I had arrived at Fab Mecca at about 10:15am, got settled in and did all of this by about lunch time. The rest of the afternoon, up until about 5pm was spent on detailing out the main rails, and yes the devil is in the details. You will see that it was a lot of work and time for a small feature, but it's kind of like custom rims on a nice car. They totally "make it". So here we go...
Setting up a piece of scrap to act as a guide for an abrasive plunge cut.
Posed photo of using cutoff wheel in 4 inch grinder to make plunge cut (hard to take pictures with gloves, face shield, ear muffs, sparks flying, etc.).
Yes there is no guard on that grinder. Not my tool, I am a guest, years of experience, don't try this at home. Nuff said.
The resulting plunge just through the one wall.
Nip off a bit with a plunge cut through the ends.
Back in a jiff.
The longer pieces are a little different, so I laid out and prick punched the intermediate xmbrs.
Change the alignment fixture around to a fence, place the long angle against fence, unlatch the punch arbor from the hydraulic ram, lower the punch pin point into the prick punch mark, step on the pedal and the ram catches up to the punch, pop goes Bob's your uncle, hold the pedal down, latch the punch arbor to the ram head, lift the pedal, and the std stripper does the rest. Both xmbrs took less than 3 minutes to punch 8 holes.
On to the main frame rails. Cutting to length. (Actually 3 cuts: first piece rough cut, second piece cut to length, 3rd square off the mushroomed end of the first piece by cutting to final length. Less moving the big pieces around that way since I had already laid the whole stick up into the saw and there was not enough run out to nip the end off first.)
Close up of the saw at work. Ho hum.
Actually, it's a very nice precision little Italian made saw (albeit a little used at this point...lots of miles under this one). Both the intermediate xmbrs and main rails (with careful attention to measuring and positioning in the saw) came out perfectly square and exactly equal to each other in length. Huzzah!
So I didn't really check the clock, but I had arrived at Fab Mecca at about 10:15am, got settled in and did all of this by about lunch time. The rest of the afternoon, up until about 5pm was spent on detailing out the main rails, and yes the devil is in the details. You will see that it was a lot of work and time for a small feature, but it's kind of like custom rims on a nice car. They totally "make it". So here we go...
Setting up a piece of scrap to act as a guide for an abrasive plunge cut.
Posed photo of using cutoff wheel in 4 inch grinder to make plunge cut (hard to take pictures with gloves, face shield, ear muffs, sparks flying, etc.).
Yes there is no guard on that grinder. Not my tool, I am a guest, years of experience, don't try this at home. Nuff said.
The resulting plunge just through the one wall.
Nip off a bit with a plunge cut through the ends.
Back in a jiff.


) I can get started on that. Will save main frame assembly and welding for next weekend when there is enough time to get it together enough to be able to move it out of Karl's way again during the week.
Got my attention. Busted several teeth off of low gear. The guys in the machine shop both felt really bad for me, they had been in similar situations before themselves. In fact they were greatful and had been abusing the poor thing pretty hard in the hopes that it would die soon and they could then justify upgrading to a more modern CNC. The boss took it well; I stood up and told him that I had screwed up, took all the blame. That's all they want. Nothing pisses them off more than people hiding their mistakes and leaving some not so little surprises lurking in the shadows. We pulled the top off of the gear box and took a look...not good. Fished out the bits that we could with a magnet, changed the oil, put a strap on the gear change lever screwed right into the side of the case so that no one would try to switch to low range, and ran it in high gear only until the end. The repair parts would cost more than the lathe was worth, not including our time to rebuild it. Enter the Fryer...Kev doesn't get to use the Fryer. The day that the guys threw the Mori Sieki into the dumpster, the logo plate broke off and the guys thoughtfully gave it to me as a momento. I wear it proudly as a lesson learned. Don't be distracted when operating machinery, complacency brings mistakes and possible injury.