I thought *somehow* I was going to prime, paint it black, and assemble without destroying the paint job. <Insert joke about best laid plans here>

It has a temporary plywood floor attached on it (included), which was to haul materials for the build prior to getting started - and then was going to be removed, sanded, and finish painting done.
Here is the link to my build thread: http://www.tnttt.com/viewtopic.php?f=50&t=60286&p=1085012#p1085012
Bearings have been removed, thoroughly cleaned, and repacked with quality grease. I'll try and grab a couple new pictures of it fully assembled when I can, it's in the garage and boxed in pretty tight after the move.

$450 FIRM, located in Parker, Colorado about a mile from the Cabelas off I-25 and Ridgegate Parkway.