Ya gotta be real brave to cut a couple 3" holes in the side of your trailer but this installation take about 90 seconds to yank out and slip on 2 fancy cloth
shower panels.
The black 2" schedule 80 pvc slides snuggly inand out of the 2 1/2" schedule 40 pvc pipe that is installed inside the tear. I left 1 outside joint unglued to break the u shaped outer rail and slip on the privacy
curtain. The clips are rings of 2 1/2" pipe that have not quite 1/4 cut away this makes a clip that were drilled for a 3/8 joining nut attached to a 1/2" 3/8 bolt This make a pocket for the fiberglass survey stakes ( 1.65 at most farm stores) A tarp or nylon cover slipped over these roof ribs completes the "tent"