OK..got a couple of pics of the ratrails installed. The walls will attach to them, both outer and inner walls. They will act as the attachment point and the lower frame rail. I'll attach the outer walls and then insulate. We start cutting the walls this Monday. I picked up some 3/4" fir in ACX grade. Truth be told it looks like AAX grade...