I just got the stripe sealed with epoxy. I'm hoping to have the red stripe painted on the camper tomorrow.
I applied an epoxy fillet to the bathroom to begin sealing it up for the shower.
I also started working on the ceiling. It seems I'm working my way from bottom to top on this build.
I had a 1x3 that ran across to roof to support the middle of the roof. It ties in the front bathroom to the rear storage areas over the bed. It's to keep the roof from sagging. Well, I had a router, so I began playing with and made some crazy oval design in it and epoxied it in place. This was many months back. I've never liked it, so I epoxied two 1/4" pieces of wood to the edges to seal it off. This will give it more strength, but more importantly it will cover up the holes which I didn't like.
The next step is to pull the trim down off the ceiling and apply the black vinyl headliner. Right now I just have black paint on the ceiling. That should just about do it for the interior of the camper, except for the shower.
I finally got the epoxy on the speaker boxes painted too.
Oh, and cupholders! I need folding cupholders!