Latest Progress

The floor assembly got attached to the trailer frame, using 3/8ths inch stainless steel bolts with flat washers and nylock nuts.
I counter sunk the holes with a 7/8ths inch Forstner bit, drilled down just enough to let the bolt head be flush with the floor.
I marked out all the dimensions for the first wall panel.
I used the string compass to mark out the radii of the door and front and rear of the side wall.
After cutting out the first side wall I flipped it over onto the second piece of wall plywood and made my marks using the first piece as the pattern.
After I got the second wall cut out I matched all the ends and edges lined up and clamped them together. I then used the belt sander with a 50 grit belt to get both edges of the walls smooth and matching.
That's all for now, will prolly mess with it some more tomorrow.
I counter sunk the holes with a 7/8ths inch Forstner bit, drilled down just enough to let the bolt head be flush with the floor.
I marked out all the dimensions for the first wall panel.
I used the string compass to mark out the radii of the door and front and rear of the side wall.
After cutting out the first side wall I flipped it over onto the second piece of wall plywood and made my marks using the first piece as the pattern.
After I got the second wall cut out I matched all the ends and edges lined up and clamped them together. I then used the belt sander with a 50 grit belt to get both edges of the walls smooth and matching.
That's all for now, will prolly mess with it some more tomorrow.
