Page 1 of 1

Todays progress

PostPosted: Sat Oct 06, 2007 3:58 pm
by Tcurr
We got second wall up front spars and vent


also made first door
ImageImage

PostPosted: Sat Oct 06, 2007 4:52 pm
by Miriam C.
:woohoo: :clapping hands: :hammer:

Nice progress you got going there. :thumbsup: Would love to see the other side of the door.

Image

PostPosted: Sat Oct 06, 2007 5:39 pm
by Tcurr
Heading out to friends for buckeye game but will post a pic of both sides of door tommarrow. Using windows from a shuttle bus. Got a really good deal on them.

PostPosted: Sat Oct 06, 2007 7:14 pm
by jeepr
Looks good! Those are some pretty substantial looking walls, how thick are they?

PostPosted: Sat Oct 06, 2007 10:14 pm
by Tcurr
Jeepr They are 1/2 oak on each side and 3/4 studing and insulation between. Being in Ohio wanted to make a 3 season so entire tear will be 3 season Insulated. Each wall is 1 3/4 I am really anxious to have it weighed becayse lifting the walls it doesnt feel that heavy.

PostPosted: Sun Oct 07, 2007 6:26 am
by jeepr
Tcurr wrote:Jeepr They are 1/2 oak on each side and 3/4 studing and insulation between. Being in Ohio wanted to make a 3 season so entire tear will be 3 season Insulated. Each wall is 1 3/4 I am really anxious to have it weighed becayse lifting the walls it doesnt feel that heavy.


Yeah, I found that in your other post. You will like the extra thickness when the weather turns bad. When I looked at it I thought it was two sheets of 3/4" ply. Now that would be a little heavy! :lol: