Help...newbie mistake

I thought...I have built many things before, so I don't need to wait for plans...
The guys on the forum are so knowledgeable and helpful, I should be able to pick up enough from them to do the job quite well..
I have the floor bolted in the sidewalls up, ready to lay vinyl and put spars in place..
Actually I am quite proud of the job so far, except for one thing...
I assembled the floor with 3/8 " CDX 2X3 frames, 1/2 " foam board and a Luan bottom (X-glued), then I coated the bottom and edges , including footwell liberally with emulsion..
Problem; I did not coat the area between the Luan and the 3/8" CDX, so I have raw wood in the sealed compartments.....
Any corrective suggestions ?
Are there " breather cores" such as a home insulator may use, that I can install in the bottom layer ?
The guys on the forum are so knowledgeable and helpful, I should be able to pick up enough from them to do the job quite well..
I have the floor bolted in the sidewalls up, ready to lay vinyl and put spars in place..
Actually I am quite proud of the job so far, except for one thing...
I assembled the floor with 3/8 " CDX 2X3 frames, 1/2 " foam board and a Luan bottom (X-glued), then I coated the bottom and edges , including footwell liberally with emulsion..
Problem; I did not coat the area between the Luan and the 3/8" CDX, so I have raw wood in the sealed compartments.....
Any corrective suggestions ?
Are there " breather cores" such as a home insulator may use, that I can install in the bottom layer ?