Gang-busters Progress

I received my HB trailer on the 13th of Oct. Since then have got it licensed, assembled, have the base frame made, covered with asphalt, have the floor on and primed, have the side walls cut out and door openings also cut out.
Need to put foam on the bottom and bolt the floor to the frame.
In a day or two I will have the sides screwed on to the floor/base assembly.
What's going to really hold me up is parts...almost everything has to be shipped in from the outside world.
John at Salida, CO
Need to put foam on the bottom and bolt the floor to the frame.
In a day or two I will have the sides screwed on to the floor/base assembly.
What's going to really hold me up is parts...almost everything has to be shipped in from the outside world.
John at Salida, CO
