What I did on Spring Break....or how to make sawdust

Had a long weekend because of Spring Break. So, since it was warm for a couple of the days I worked on the trailer! I finished up the side walls, insulated them and stained them and then attached them to the floor frame.
I also added a few roof spars which was fun. I framed the vent location.
Now I need to get more 1/8" plywood to get the inside ceiling in. Just a side note, the styrofoam insulation, the white stuff, is a pain to work with. Little white balls of foam all over the garage. I will use the pink or blue stuff in the roof....
I also added a few roof spars which was fun. I framed the vent location.
Now I need to get more 1/8" plywood to get the inside ceiling in. Just a side note, the styrofoam insulation, the white stuff, is a pain to work with. Little white balls of foam all over the garage. I will use the pink or blue stuff in the roof....
