BoxKite Phase II underway

I have a trip comming up and nothing like a little pressure to get more done.
broken down to 4 phases one a wk or sooner.
Wk 1. front storage area / wind reduction in front.
the wind resistance at the front of the trailer is poor (was built for truck to pull and so with car wind hits it reducing gas milage.
I have area in the front for a landing where I can put a box to hold battery, Tire, wood, and other things that might otherwise weigh down the front.
Wk2 finsish fender hopefully will not take a wk so I can work more on phase 4
wk3 build insert for my door then new doors. frame is week now and instert will strengthin frame.
wk 4 rear hatch to hold lights and paper town holder. and cross shelf in back will also be built.
should be done aug. 15
Ron D
broken down to 4 phases one a wk or sooner.
Wk 1. front storage area / wind reduction in front.
the wind resistance at the front of the trailer is poor (was built for truck to pull and so with car wind hits it reducing gas milage.
I have area in the front for a landing where I can put a box to hold battery, Tire, wood, and other things that might otherwise weigh down the front.
Wk2 finsish fender hopefully will not take a wk so I can work more on phase 4
wk3 build insert for my door then new doors. frame is week now and instert will strengthin frame.
wk 4 rear hatch to hold lights and paper town holder. and cross shelf in back will also be built.
should be done aug. 15
Ron D