by Bezoar » Wed Mar 24, 2021 3:27 pm
Thank you, Bruce. That helps.
My controller is 20 amp, and I won't be using more than that at a time, so I can send my load through there. I was going to put a fuse at the battery before my fuse/distribution box, I suppose I will now put it between the PV controller and the distribution box.
Should there also be a fuse on the line out of the PV controller to the battery?