Almost a month early! I can't even go get it for a week because I totally wasn't prepared. I don't have the 7-pin connector and I want to get my brakes to 100% before I haul a trailer back four hours.
This won't be my build thread - going to come up with a name for it and lead with pictures, but I had to share. I'm leaning towards BMLT for a name - "Big Man's Little Trailer"
Here's the build sheet
- 6 X 12 Single Axle Enclosed Trailer
- 3.5K GVW Leaf Spring Axle With Elect Brake
- Add 6 Inches To Interior Height
- Drop Axle
- 16” On Center Cross Members
- V-Nose
- 30 X 15 Window
- Fold Down Stabilizer Jacks
- RV Style Flush Latch
- 60” Triple Tube Tongue
- Value Package (ATP Stone guard, roof vent, interior light w/switch)
- Light Pewter In Color
- Spare Tire
- 1” Thick R-4 Expanded Polystyrene Ceiling Insulation
- White Vinyl Ceiling
- 1” Thick R-4 Expanded Polystyrene Wall Insulation
- 24" X 24" Cast Aluminum Access Door With Lock
- 15" X 30" Window With Vertical Slider (Mounted In Door)
- 30 Amp Breaker Box With Motor Base Plug
- 110 Volt Interior Receptacle X 2
- 110 Volt GFI Receptacle
NOTE: Slider window centered between side door and rear start 12” down from ceiling
NOTE: Spare shipped loose
NOTE: 24 X 24 centered in driver’s side of V-nose 9” down from top hinged on top
NOTE: Breaker box below access door 30 inches off floor
NOTE: 1 receptacle centered 4 inches below access
NOTE: 1 receptacle opposite side of V-nose same height
NOTE: 1 GFI left side of side door, 9 inches back toward rear
I've already got a lot of stuff for it - the air conditioner, generator, inverter, shelves, bed, and fuel cans. Some things I have picked out already awaiting delivery like the batteries and paneling. I'm going to take it out in some form or other in Late September - hopefully more complete than not, but if it's like anything else, it will never be comlete.