Wookie97 wrote:Trailer is looking good. Im ready to start work on mine, trailer should be here in 2 weeks and my parts started arriving last week.
Good luck to you. If you're anything like me, I thought this would be easy.

It's taking me three times as long as I originally thought. Insulating, so far, was the worst. It just didn't seem like I was making any progress. Once the walls starting going back on I felt a little better.
So, in 7 hours today I got pretty much all of the wiring roughed in, all the plywood walls in place, and a couple sheets of luann up on the ceiling. While I worked away at the wiring and wall panels my wife built interior cabinets and painted the ceiling panels.
Wife putting together cabinets:

LED wiring and switch (in the knot in the panel on the left side):

Switches at the door for porch light and half the rear cargo area:

All the wiring roughed in. I had to shim the interior panel of the air conditioner to allow access for the electrical wiring:

A couple ceiling panels in. I need to buy some additional screws.