Hardboard applied to walls. These are able to be wiped with 10% bleach and gave a nice color. Used Liquid Nails (get the LARGE), requiring 1.5 tubes per panel. The "furring strips" are actually plywood strips screwed into the gaps between panels to hold panel while adhesive dries......

Pops holding up the hardboard....BEST PART OF THE PROJECT (spending time with Pops)

The framing is in the front of the trailer.......the left enclosed side will be the electrical closet.......the right side is in the bathroom....

Just another view of the electrical closet and bathroom (where waterless toilet will fit)
