by DogStar » Sat Feb 04, 2012 3:17 pm
Frame is completed, per factory.
Axle mounted and tires.
Tomorrow (maybe) I buy 2 pieces of Oak hardwood plywood, 1/2 inch for the utility deck. Final deck size 5 x 8 feet.
I will put 5-6 strips running the length of 8 feet, oak strips appx 1/4 inch thick x 1.25" wide. Purpose just to allow easier sliding of panel materials onto deck. Sheetrock, plywood etc.
Underside of entire trailer will be undercoated in some manner, all exposed surfaces will most likely be done in spar varnish. A "matching" oak low stake body will also be installed, again for utility mode use.
Once all of that is done, plus all wiring, including brakes, then the Teardrop construction itself begins. Hopefully Springtime will be here by then and outdoor working temps will be better.
Always with my thanks,
Eric
(aka DogStar & ELDogStar)