Got some more work done on my tear over the weekend.
I finished placing the studs on the first wall.
Then I bought a 1/4" countersink drill bit this weekend. I flipped the wall over, removed the screws and redrilled the holes with the countersink bit. Once the screws were back in, I found that they were pretty flush with the masonite.
Then I put the trailer on jacks, removed the wheels and leveled her off. The trailer sits pretty level both across the length and width. I found I didn't need any extra shims to level it off.
The wood in the front of the trailer bows down a little so that a board laying flat has a gap underneath. I will cut out a furring strip to adjust for the irregularity so that when I attach the walls everything will be leveled up.
Then I had to cut the hind end parts of the interior paneling so that I can attach them to the studded/insulated walls.
Now all I have to do is stud the other side.
GO STEELERS!!!!
