It was all hands (and clamps) on deck for wall assembly. My brother-in-law and two of my three boys were on hand to help.
On the surface, it seems relatively simple - just glue the walls together and BAM! Well its not quite that easy. Wires have to be dealt with, clamps have to be placed, walls have to be aligned, clamps have to be moved, oozing epoxy wiped off, walls aligned, mix more epoxy, grab another wall, pull more wires... what's the pot life on the epoxy?!?!?!? All-in-all it went well. The biggest issue was clamping the side walls to the 6' wide front bulkhead with 5' bar clamps. In all of the chaos, I neglected to snap a picture of that masterpiece.
- DSC00143.JPG (167.47 KiB) Viewed 3025 times
Snap your fingers and viola, the walls are up!
- DSC00146.JPG (186.06 KiB) Viewed 3025 times
I wanted to point out that we assembled them all on some bolts to hold the walls off of the VHB tape. I wanted to be able to move/adjust the position if necessary. More on that later...
- DSC00162.JPG (116.66 KiB) Viewed 3025 times
That's all I have for tonight. Plenty more pictures to post, hopefully soon. As always, feel free to as questions or comment.
Steve