Was hoping to get the roof done this weekend, but with other projects first I only got a bit done. .
Started with the back portion of the trailer. I was going to overlap the first layer with a 1" seam, but decided I had better do a 2" just to be safe. I sized the edge of the next canvas piece so I could cut a straight edge on it. I also marked a straight line back 2" from the first layer. This will give me a visual to line up to with the new piece.
![DSCF3756.JPG](./download/file.php?id=13545&sid=26bf78d8cda5b3d7ca8bd5350fe0931f)
- Canvas lining up
- DSCF3756.JPG (168.74 KiB) Viewed 16414 times
Next was to apply glue and line everything up.
![DSCF3757.JPG](./download/file.php?id=13546&sid=26bf78d8cda5b3d7ca8bd5350fe0931f)
- Glued straight
- DSCF3757.JPG (166.28 KiB) Viewed 16414 times
And once rolled out I have a nice straight roof seam.
![DSCF3758.JPG](./download/file.php?id=13547&sid=26bf78d8cda5b3d7ca8bd5350fe0931f)
- Finished roof seam
- DSCF3758.JPG (163.27 KiB) Viewed 16414 times