Wanting our fresh concrete set up a little before we work around it, we went on to do other work. We have more to do on the barn but opted for some trail work. We really love trail work and have not done much in a while. So while it wasn't much of a physical break.. it was a nice mental change of pace.
We had a downed tree to clean up on one trail, We also had 2 recent dual track sections that had some recent logging done. Neither place was horrible, but a good clean up would make a huge difference. On the way out to the sections we had a small tree to take out on another trail. It is a nice fun fast section, that had a little bottle neck. While I like trying to manuever through tight tricky places.. this one seemed to "ruin" the flow. There were 4 trees fairly close.. and you had to kind of zig-zag through them.. which is tough at speed. I ended up taking out a different one than planned… then seeing how that works.
We didn't end up doing much house building yesterday. The work in the woods loosened up some "stuff" on the tractor. So I worked on that. We did get some pressure treated decking ripped, for strapping on barn. We got it placed up on a roof, near an upper area wall. I remembered we wanted to get a ride in, so switched over to that.
With all our work we haven't been riding enough, and I want to try and change that. We also wanted to check out the new trail work. I also had 2 new strava segments that I wanted to check out with the "new" bike.
Yesterday we had somewhat drier weather.. then this morning humid again. We have cold fronts coming through today.. and with it some heavy showers. They are frequent and heavy enough that we are not working outside. While we have the the dumpster [for tearing our house wall apart] we thought doing some cleanup in the barn might be a good idea. Wow we have a real heavy shower right now.
