A little bit every weekend...
We're slammed busy at work, but there's talk about shutting down for two weeks over the holidays.
Two weeks of trailer time.
My raw countertops are made and fit... Laminate ordered.
They'll have to come back out for that.
And the upper cabinets are built... The boxes, anyhow. It kinda divides the space into kitchen and sleeping areas.
I think I'll just put an open shelf over each window... Somewhere to mount my task lighting.
I finally covered up that ugly, white AC box.
There will be a frame with a seal surrounding the AC, and a false drawer front to hide the cord.
I'm still trying for the "barn" look with the all the squares posts. They're hollow to keep the weight down.
The gaps at the ceiling are for the 1x4 "beams that will cover the ceiling panel joints.
The space behind that post needs something hanging in it.
In the back of my mind, I've always been unhappy with the way my side door latched. Today the sun was hitting it and I could see light coming in around it.
Deciding something needed to be done, I started playing with it and realized that the factory installed the strike plate backwards, or upside down, whatever.
A couple new screw holes and problem solved.
I'm not going outside until the temperature is above my age.