Hey everyone: I was able to complete a little more work on the Silver Nugget over the last few days.
I got one coat of marine spar varnish on the red oak cabin cabinet face frame.
I started on the basic wiring of the fixtures that need to be installed through the outer walls so I can do more of the galley cabinets.
I added the cable TV fitting hook up below the 110 Volt hook up.
Here is how it looks from inside the galley. I will replace the long screws for the cable hook up with SS machine screws that are shorter, later. These screws are only for mock-up now.
I mounted the porch lights to the sides of the TD, too.
I had to route a trough in the mounting block for the porch light wires so the inner wall skins will set flush against the blocking.
That is it for this update. I hope you all have a great week !