Bryan:
I just looked through my photos and really don't have any, but here's as close as it comes:

I build with a ledge on the sandwiched walls so it's a bit different if you are building with a solid plywood sheet. But here's how I do it:
-Set the bulkheads in place.
-lay the ceiling on the wall ledges and butt the back of it to the bulkhead (or cut a kerf at the proper angle in the bulkhead and slip it in. You may have to wedge some toothpicks into the top off the kerf while the glue sets up since a tablesaw blade is a bit wider than 1/8" plywood.)
-place a spar on top of the ceiling
I staple (and glue with PL Premium) my ceiling to the spars with 1/4" crown staples. If you set a super bright flashlight on the ceiling you can see where your spar is. Some builders just glue the ceiling to the spars by wedging 1 x 2s between the floor and the spars but my old eyes are okay with the tiny staples.
Are the days short enough up there yet?
T