Hello out there: Like I said yesterday, I went to Pam M.'s house and we got a bunch more done on her TD. I spent the afternoon and early evening helping her on "Miss. Independence",

so I put mine on hold.
I got back on my TD this morning and got some more done today on the build. I finished up installing the wall studs and blocking for the light switches, porch lights and I finished trimming out the door openings.
I did not have any help when I placed these rear vertical supports for the wall skins and I had this cargo holding bar in my truck and it would not go as narrow as I needed it to. So I drilled new locking holes it the bar and it worked like a champ. The two holes go straight through the bar and there are spring loaded pins that snap into the holes I drilled. This held the two boards in place so I could glue and screw them in place from the outside of the trailer.
This is what it looks like now with the framing and blocking installed.
In the next picture, the blocking for the light switches and the larger piece of wood on the top will support the screws for the porch light and are now attached.
Below you can see how the door opening was trimmed out. I used some oak, some poplar and some 3/4" plywood. You can see the different woods in these next few pictures. I used oak for where the door latch will be attached to. This way the screws will hold better than they would if I used a softer wood.
In this picture you can see all three kinds of wood I used. They are glued to the inside piece of wall plywood and glued to the other types of wood and they butt up together. I used a lot of PL poly adhesive here.
This is at the top of the door opening where it starts to sweep downward on the rear of the opening. I still need to do some finish sanding.
I still have some daylight so I think I will try to get the wood supports for the overhead cabin lights added to the vent fan spars before calling it a day. After that I will need to remove the spars and cut the inner wall skins to fit over the wall studs and blocking. Then I will start running wiring to the lights and switches and insulate the wall cavities.
It is getting there!
