I'm back on the hunt in the garage/shop! Our weather has been all over the map from snow to 65 degrees. There have been a couple of good productive days this last weekend. I've run the wiring in the walls and ceiling. Sorry about the dark images.

Tongue view.

A little higher.

From the galley.

Passenger's side front running light wiring.

Passenger's side aft wiring.

Driver's side aft wiring.

Driver's side front running light wiring.
I've cut all the wiring into grooves in the first layer of insulation, installed the wall insulation and fit all the remaining insulation on top.
I then made a template for the icebox out of cardboard including drawer face.

Here's what it will look like with the drawer closed.


This is how the inside will look.

The voids on both sides will be filled with insulation.
Since we will be working on the metal work I thought I better get on the fenders. So I made the template for that too. I made it the same on both sides to test fit. They will be built with the inside as just an attachment band.

Here's the fender pattern on my kitchen table.



Here's how it looks clamped in place (approximate that is) on the driver's side.





Just for kicks I clamped it on the passenger's side too.

So much for the last week, more to come soon.
Cheers,
Dave