I've procrastinated posting my build log, so this first post is going to be long (sorry) in order to catch up.
I started by ordering a ton of parts. I want to put everything into CAD and find that it's best to take measurements from the actual parts instead of relying on spec sheets:
Here's the CAD model coming together:
Then it was out to the shop to actually start the build.... I made paper templates on the laser cutter to help get all the metal pieces cut perfectly:
Then a bunch of welding:
Assembling the axles and temporarily attaching the wheels to make sure everything lined up:
Making the mounts for the water tanks and battery:
To prep for paint, I wanted to clean the scale. These really cool pads from 3M made the job go quickly:
First a coat of primer:
Then a coat of black Rustoleum:
Next, I started building the floor out of ACX plywood. I know the Vistabule used aluminum foot pans, but I made mine out of plywood. I also added hatches for easy access to the water tanks:
Then coated all the exposed underside with Henery's:
And that's where we are today. Next up will be CNC cutting the walls!