Unfortunately, I have to work all weekend at the rescue station, so I thought I'd try to get something accomplished tonight. The raised deck with electrical conduit is my next step.
I placed conduit boxes at each of the wire drops for running lights and trailer brakes. I'll be pulling wire through next week.

There is the routed trench where the A/C return pipe will go, as well as a narrow trench to run the 110V wiring. The aluminum stip on the back is just reinforcement for the spare tire holder. I'll pick up some insulation next week to fit into the open areas. Anything that has conduit will be hit with expandable spray foam.

I was going to paint, but told myself that this stuff will never been seen once the top deck is added. Still lots to do on the raised deck, but got a bunch accomplished tonight.