This is the pattern that was made to form the 6 and a half foot framing members for the front of the trailer

It is being used to make the top of the shower unit. These are the special tools used to shrink the metal.

These tools are being used to fabricate the trim on the front of the trailer.

This tool is being used to capture the tuck in the shrinking process.

This is the top of the shower unit.

This is a test fit of the shower in the trailer.

That is the water heater under the seat of the shower unit. This is the final fit of the shower in the bath.

This is a look in through the slide.

This is the bed with storage underneath and the fresh water tank below that within the frame members.