Smiles to go! Updated 8-2 new pics! First trip!

...ask your questions in the appropriate forums BUT document your build here...preferably in a single thread...dates for updates, are appreciated....

Re: Smiles to go! Updated 7-6 new pics! FG and epoxy

Postby dales133 » Thu Jul 09, 2015 9:06 am

Looking good.
Hadn't checked in for a bit you made alot of progress in a short time
User avatar
dales133
4000 Club
4000 Club
 
Posts: 4605
Images: 1
Joined: Mon Oct 13, 2014 5:26 pm

Re: Smiles to go! Updated 7-6 new pics! FG and epoxy

Postby booyah » Fri Jul 10, 2015 9:27 am

quick update, built kid bunk and installed it. Tonight I am working on basic countertop, insulating the galley and possibly working on the hatch
My build, 5x8 modified benroy "Smiles to go". Started April 2nd 2015, first trip August 2nd 2015.

viewtopic.php?f=50&t=63145
User avatar
booyah
The 300 Club
 
Posts: 424
Joined: Fri May 16, 2014 5:27 pm
Location: Lansing MI

Re: Smiles to go! Updated 7-6 new pics! FG and epoxy

Postby booyah » Mon Jul 20, 2015 8:41 am

Another no pictures update

Got the rest of the staples pulled from the inside, maksed things off, and we're ready to paint the inside

Got two thick coats of epoxy on the hatch, going to have to trim the FG and let that cure. Will probably do a quick sanding on it tonight to see if it needs another coat or not

Did a quick rough sand on the trailer last night so we are going to start exterior paint to night. Got a fuse box, main fuse, pull down latches and shore power adapter on order (should be in tomorrow) so once I'm done with paint we should be golden on that.

Wish us luck, we're painting tonight!
My build, 5x8 modified benroy "Smiles to go". Started April 2nd 2015, first trip August 2nd 2015.

viewtopic.php?f=50&t=63145
User avatar
booyah
The 300 Club
 
Posts: 424
Joined: Fri May 16, 2014 5:27 pm
Location: Lansing MI
Top

Re: Smiles to go! Updated 7-6 new pics! FG and epoxy

Postby booyah » Tue Jul 21, 2015 12:52 pm

Got one coat of paint on, need at least another two I think. I hope to have pics up after tonight's coat #2
My build, 5x8 modified benroy "Smiles to go". Started April 2nd 2015, first trip August 2nd 2015.

viewtopic.php?f=50&t=63145
User avatar
booyah
The 300 Club
 
Posts: 424
Joined: Fri May 16, 2014 5:27 pm
Location: Lansing MI
Top

Re: Smiles to go! Updated 7-6 new pics! FG and epoxy

Postby booyah » Wed Jul 22, 2015 8:31 am

Three coats on the outside, everything except for the hatch, painted the inside a nice soft blue (wifes choice)
Doors are going on tonight!

20150721_194625.jpg
20150721_194625.jpg (54.04 KiB) Viewed 3023 times



20150721_194605.jpg
20150721_194605.jpg (97.71 KiB) Viewed 3023 times


Goign to add some accent colors later, either blue or red 4" bar below the doors, that will angle up at a 45 degree angle to the hatch hinge.
My build, 5x8 modified benroy "Smiles to go". Started April 2nd 2015, first trip August 2nd 2015.

viewtopic.php?f=50&t=63145
User avatar
booyah
The 300 Club
 
Posts: 424
Joined: Fri May 16, 2014 5:27 pm
Location: Lansing MI
Top

Re: Smiles to go! Updated 7-22 new pics! PAINT!

Postby sincere01 » Wed Jul 22, 2015 12:28 pm

Looking good! Excited to see this build progress.
Cheers,
Scott

My build thread: http://tnttt.com/viewtopic.php?f=50&t=63853
User avatar
sincere01
Teardrop Advisor
 
Posts: 64
Joined: Mon Jul 20, 2015 5:03 pm
Top

Re: Smiles to go! Updated 7-22 new pics! PAINT!

Postby booyah » Fri Jul 24, 2015 2:34 pm

No new pics yet.

Doors are on, rear galley wall/bulkhead is sealed up with a piece of the 1/8th in birch
Put in the rear counter top brace and building a counter top for that now. Paint is inside as well. Painting the hatch this weekend, routing the counter top, and hopefully working on wiring tonight.

Hope to have it out next weekend. A far cry from "done" still, but I'll settle for "serviceable"
My build, 5x8 modified benroy "Smiles to go". Started April 2nd 2015, first trip August 2nd 2015.

viewtopic.php?f=50&t=63145
User avatar
booyah
The 300 Club
 
Posts: 424
Joined: Fri May 16, 2014 5:27 pm
Location: Lansing MI
Top

Re: Smiles to go! Updated 7-22 new pics! PAINT!

Postby surplus 6 » Fri Jul 24, 2015 5:05 pm

very cool build thus far :applause:
surplus 6
Teardrop Inspector
 
Posts: 3
Joined: Thu Jun 25, 2015 3:42 pm
Top

Re: Smiles to go! Updated 7-22 new pics! PAINT!

Postby Gunguy05 » Sat Jul 25, 2015 7:43 am

Looking good! :thumbsup: :thumbsup: :D
Brian


Checkout my buildThe Regal Eagle Bow front for 4
Image
Also my teardrop updates from blog on Dad Rambles
User avatar
Gunguy05
The 300 Club
 
Posts: 385
Images: 6
Joined: Mon Dec 02, 2013 4:45 pm
Location: South GA
Top

Re: Smiles to go! Updated 7-22 new pics! PAINT!

Postby booyah » Mon Jul 27, 2015 9:51 am

So maybe pics tonight

All cabin electrical is now done, ceiling fan is mounted and wired, switches are installed, reading lamps, porch lights, and 12v outlets and USB ports are wired in the cabin.

The fuse box is going to be in the tongue box with the battery, and I haven't done that yet.

Entire cabin is painted (I hadn't done the ceiling as I wanted to varnish it, but he wife was concerned about the VOC content, so paint is is), the galley is rough assembled. We have a varnished counter top that is 1/2" CDX plywood with a piece of the 1/8th inch birch glued to it, trimmed with the router and rounded over. Back wall of the galley is also varnished. No cabinets, or storage bins yet, but those are optional at least for now ;)

Hatch is now painted and ready to attach. Hinge needs to be trimmed yet.

4" memory foam spa sensations mattress from walmart has been ordered.

My todo list to be campable now includes (front of trailer to back)
------------------------------------------------------------------------------
peal and stick tile in cabin and galley
Bolt down tongue box
Finish electrical in the tongue box (wire up fuse box, battery terminals and main fuse)
buy a battery
Trim hatch hinge
install hatch hinge and hang hatch
weather seal hatch (weather stripping)
install pull down latches
Install mattress

Mattress is due in Thursday, hoping I can get everything else on the list done before then and MAYBE take the kids on a short shakedown cruise this weekend.
My build, 5x8 modified benroy "Smiles to go". Started April 2nd 2015, first trip August 2nd 2015.

viewtopic.php?f=50&t=63145
User avatar
booyah
The 300 Club
 
Posts: 424
Joined: Fri May 16, 2014 5:27 pm
Location: Lansing MI
Top

Re: Smiles to go! Updated 7-22 new pics! PAINT!

Postby KCStudly » Mon Jul 27, 2015 10:32 am

Highly recommend using a flooring adhesive compatible with your peel and stick tiles. I did a new plywood work bench in my non-climate controlled garage one time and as soon as they sat in a hot day several got loose and peeled up. Peeled them up, used adhesive as for non-self adhesive tiles on them and have not had a problem since.
Last edited by KCStudly on Mon Jul 27, 2015 8:20 pm, edited 1 time in total.
KC
My Build: The Poet Creek Express Hybrid Foamie

Poet Creek Or Bust
Engineering the TLAR way - "That Looks About Right"
TnTTT ORIGINAL 200A LANTERN CLUB = "The 200A Gang"
Green Lantern Corpsmen
User avatar
KCStudly
Donating Member
 
Posts: 9633
Images: 8169
Joined: Mon Feb 06, 2012 10:18 pm
Location: Southeastern CT, USA
Top

Re: Smiles to go! Updated 7-22 new pics! PAINT!

Postby booyah » Mon Jul 27, 2015 1:31 pm

I was looking into that KC, but for the ones I bought people were saying NOT to use any additional adhesive. I guess I'll see how it goes, but I appreciate the input
My build, 5x8 modified benroy "Smiles to go". Started April 2nd 2015, first trip August 2nd 2015.

viewtopic.php?f=50&t=63145
User avatar
booyah
The 300 Club
 
Posts: 424
Joined: Fri May 16, 2014 5:27 pm
Location: Lansing MI
Top

Re: Smiles to go! Updated 7-22 new pics! PAINT!

Postby booyah » Tue Jul 28, 2015 9:58 am

Still no pics, spending too much time working

Hatch hinge is trimmed, and the top of the hinge is installed (double silicone sealed, one bead under the hinge, one at the top edge)
Tongue box is bolted down
Battery box is bolted down inside tongue box

Peal and stick is tonight, and possibly installing the bottom of the hatch hinge.
Once thats done the fuse box and finish electrical is next.
My build, 5x8 modified benroy "Smiles to go". Started April 2nd 2015, first trip August 2nd 2015.

viewtopic.php?f=50&t=63145
User avatar
booyah
The 300 Club
 
Posts: 424
Joined: Fri May 16, 2014 5:27 pm
Location: Lansing MI
Top

Re: Smiles to go! Updated 7-22 new pics! PAINT!

Postby KCStudly » Tue Jul 28, 2015 3:48 pm

It was many years ago when I did my peel and stick, so maybe they have improved. :worship:
KC
My Build: The Poet Creek Express Hybrid Foamie

Poet Creek Or Bust
Engineering the TLAR way - "That Looks About Right"
TnTTT ORIGINAL 200A LANTERN CLUB = "The 200A Gang"
Green Lantern Corpsmen
User avatar
KCStudly
Donating Member
 
Posts: 9633
Images: 8169
Joined: Mon Feb 06, 2012 10:18 pm
Location: Southeastern CT, USA
Top

Re: Smiles to go! Updated 7-22 new pics! PAINT!

Postby booyah » Wed Jul 29, 2015 8:27 am

STILL no pics (yeah i know, I'm lazy)

last nights update
Hatch is installed, some clearance issues to sort out, I don't think its anything a belt sander and some weather stripping cant fix.
place where the pull down latches will be installed was reinforced
temporary hatch supports were measured and cut, need something better here.
Peel and stick floor is installed
Tongue box has the shore power outlet hole cut, and outlet installed
Mattress arrives today (according to UPS)

Todo list contains
-------------------------
Finish fuse box and terminals for battery
buy battery
Tweak hatch fit and weather seal hatch (weather stripping)
install pull down latches
Install mattress
My build, 5x8 modified benroy "Smiles to go". Started April 2nd 2015, first trip August 2nd 2015.

viewtopic.php?f=50&t=63145
User avatar
booyah
The 300 Club
 
Posts: 424
Joined: Fri May 16, 2014 5:27 pm
Location: Lansing MI
Top

PreviousNext

Return to Build Journals

Who is online

Users browsing this forum: No registered users and 5 guests