I see the pic is still here.
I have my PD4045 mounted and my DC and AC wiring in process. DC outlet, pump switch and sink light are completed. I have wired a switch for rope lights that are on order. I'm using it for a temporary work light. I need one more for loft bed. AC wiring - I'm only having 3 outlets. 1 in couch/sofa bed cabinet. 1 in front by V. And an outside outlet. The couch is completed. And IT WORKS as well as my DC.


.
I'm not sure about the 2 existing dome lights- they work only when connected to TV. I've separated it and had my boat battery supplying power to them. With the existing CT wiring no charge is going to breakaway small battery. So I can wire it to my CT battery or leave it as is. If I do this I'll add a battery discount and the dome lights to my power panel.
No more moving walls they are all mounted. Paneling isn't completed for front and one side of shower. But sink area is. Water is next I picked up some fittings- but . I've had what I believe was/is a sinus infection now moved to my chest so once again I'm SICK.



.