OK- finally doing the update. Been a slog, but upper doors installed and fit. Side doors installed and fit. Lighting installed with 3-way switches on both sides of the bed pedestal. Then had the lower front coated with a rhino-lining like coat for $450.
Next up- latches to hold the top down in front - hinge raises up and creates a gap in the raised position.
Then the interior headboard, battery, gallery, etc.
Then we paint desings on the exterior.
[img]

[/img]
[img]

[/img]
[img]

[/img]
[img]

[/img]
[img]

[/img]