I'm making steady progress on the teardrop. The 1/8" plywood roof panels are fitted and sealed. Today I fitted and glued in the roof insulation. This took way longer than I expected, but it turned out well.

I insulated the front storage module first. Notice the vertical solid wood piece that will provide a solid mount for my LP gas regulator.

Deep relief kerfs allow the foam to bend around the roof curves. I routed channels for the wiring.

This is over the cabin dome light.

This is the porch light junction.

1/4" Baltic birch clamping boards screwed in with washer head screws provide enough pressure to hold the foam in position while the glue dries.

I'll even out the plywood roof edge and the solid wood spacers with a hand plane tomorrow and then staple and glue the roof in place. I also need to install foam in the space on either side of the front storage module. The plan is to apply the aluminum sides on Tuesday afternoon!