I got a lot done this weekend, but not a lot to show. I got all the windows done with the trim rings in, all the pex water lines are in and mostly connected up, all the LP connections are in, the stove is mounted with the backer board in, and I solved the problem I was having on how to connect all the drain lines up under the bathroom sink and into a single line to the Gray water tank below. (I'll take some pics of that when I am finished. It will be unique, but will work great I hope.)
Basically, I am all set to start the kitchen framework and the booth seating area. All the infrastructure is in that needed to be there first. You can see the other-side 30 fresh water tank setting in position. I need to build that partially under the booth seat similar to the way I built the other partially under the cabinet. I will connect it up to the other tank with a line under the floor that will go down and come up on the other side. Just waiting for that line to connect of the water system and give it a pressure test. That section of flooring will be the first to insulate this winter. The water line will need to be protected from freezing (not much to worry about in Florida... but I do plan to go other places too.


Just need to run the FW line from the other side tank and connect the fill line, and it will be ready to test.