I figured we might do some trail work, until it was warmer out. We got outside, and it was pretty comfortable.. so we stayed and worked on the house. We got the rest of the purlins up.. and then worked on that flashing area. We put down a PT 2x6 for the upper purlin and then placed a piece of PT decking on top. Our flashing will mount to the wall above that. Next year when I put metal roofing on the porch roof, I will just slide out the decking and slide in the roofing.
After getting this done, I thought we might go out and do a little trail work. The hard thing this time of year is the leaf drop. It makes some of the trails very hard to see.. especially after dark. I was going to leaf blow some trails.. but I also know in a week they would be in need again. So we decided to wait on the leaf blowing, and do other work.
Late last year we roughed out an alternate route at the far end of Chasing Rabbits. It was roughed out but not finished. We have found we are riding it a bit anyways. I decided to work on that. So first we did a little string trimming, then we worked on cutting out all the little stumps. It had some deeply undulating terrain. Some, what I like to call wheel stuffing dips. Stuff easy to endo in. We smoothed it out a bit. We take the tops of the mounds and fill in the deeper holes. This trail still has a lot of undulations… but they are smoother or the edges aren't as sharp. In doing this we remove some of the fern roots etc. So it will be less maintenance in the future. We got this done.. or at least done enough for now. [We need to ride it a bit, to see what else it might need.] I was pretty tired from all the digging, and had realized we had not leaf blown anything.. but I was beat and it was lunch time.
Driving back home, we came across a big down tree snarl in our way. Sooo more work.. we but it all cut up and moved. So now we get back to the house and are really tired and hungry.. and we find Dave and Angela were there and ready for us to take them for a ride…
So we run inside.. and change.. and away we go.

[I did grab an ensure to hold me over]
We went for a nice ride.. had a late lunch.. then headed back out for some house measurements.. and to start a material list for tomorrow.