KCStudly wrote:One more thing that may or may not have made the wall to floor joint stronger and less prone to splitting the cedar; I staggered the row of screws. Rather than putting them all in a straight line down the center of my 2x2 sill board, I staggered every other screw in or out about 1/2 inch so as to broaden the footprint of the clamping effect and lengthen any potential interruption between individual wood fibers. IIRC I spaced the screws every 6 to 8 inches or so along the length of the wall; probably a little overkill but it made for a nice solid joint that pulled the PLP down nicely.
Glad to hear somebody else does this
