by fourbtgait » Fri Aug 04, 2017 9:31 pm
Nose cabinet built, only 11" deep. After the fact I was going to raise the left/right shelf up 6" but the glue already dried. Oh well. Prime, paint it then skin face frame. Center bead board portion has fuse box under it, usb on top, will get formica. Basically a place to throw keys, phone, bluetooth speaker, spare gun.
Kitchen ready to prime/paint, skin face frames. Going to install clear sliding doors on the upper cabinets. Need the track to establish skin height.
Windows came in mid week finally, install tomorrow morning when rested. Water tank, pump should be in end of week, which then allows me to install kitchen drawer frames.
Oh, and the ice chest drawe had epoxy fillet installed woth 6" wide, 6 oz fiberglass securing sides/bottom. That will get sealed this weekend. Hoping to take it out next weekend for citthroat fishing in the mountains.