let me go back 3 days and start there
1st day stripped it down to the studs and insolation and started installing my solar panels
2nd day finished installing me solar panels had to make new brackets didn't trust the ones they sold me to hold going down the road at 65mph
3rd day ran wiring and put up ceiling and walls installed 3 outside lights
day 4 got up all the trim boards and the bace for my bed and got the solar started hooking up got refrigerator installed and cabinets will have to wait tell we get back
day 5 hope to finish solar did't happen still like a little bit on the solar
day 6 get trailer finished get it loaded get food and keep a eye on frig to make sure the solar can handle it by my calculations it should
well got it dune all the camping stuff in it still needs to be painted and some cabinets added but it can be camped in
today is day 7 take off for a 5 day camping trip ya I like to push things to the last min.
