Got some "J" molding from my local glass guy. It gets mounted on the wall to hold a 12" wide piece of plywood to close in the sides where all of the wiring is.
I have a small piece of plywood in the track for mock up.

Also mounted my remote control TV mount that folds up against the ceiling. Plan on mounting a 40" tv on it.


Got all of the inside plumbing done......tanks are installed under......will wait for nicer weather (March) to go back underneath and do the final hookups.
Tied in the vent for the grey water tank, with the black water tank, so only one roof penetration. Sinks and shower will use a "wet vent" (old plumbers version) so as to reduce floor and tank penetrations.

Bath sink

Kitchen sink...hot water heater. This sink has a one way air admittance valve at the top.

Waiting for a battery fuse and disconnect switch before installing the shower wall and pan.......maybe next week.......although the forecast is for 8-10 degrees over the next few days,
and my space heater won't keep up with those temps.
Will post more as projects are completed.
I do have one question, not that I will be doing it right away, but just preparing. On my rooftop 13.5 ac unit. There is a foam seal around the bottom attached to the frame. Do I need any other sealant under this foam ......butyl.......dicor ??????
Thanks Guys.......................Tim