Ravens Nest galley update..
Weather has been really nice here the last few days

,, was able to complete the building of the cabinets, doors, drawer fronts

.. then everything went outside the be sealed and finished..
Bulkhead, drawer boxes, doors, drawer fronts and all cabinets were sealed with the mix,
Cabinet frames, doors and drawer fronts will be finished off with a top coat of varnish..
Upper cabinets framed and ready to finish

Sealing all the doors and drawer fronts..

Sealing the upper cabinet and frame for the lower cabinets..

Installing the cabinets and lower frame..

Working out spacing for the lower cabinet drawers..

Frame, drawer boxes, drawer fronts and top installed in galley

Installed solid surface pull out cutting board in cabinet

Camp stove drawer with pan and skillet space under it, mounted on 26" full extension drawer rails..

blue tape edged on cabinet and counter to protect from the PL adhesive under frame..

Propped up the cabinet and applied the adhesive for the frame to set on the counter top

Everything glued and screwed together.. was time to add the doors..

Doors hinged and adjustable shelves in place..

Right side cabinet has the back cut out, this cabinet will be used for the coffee maker.. coffee will be accessible from inside the cabin,, can have fresh coffee

in the morning with out going outside to make it..

Time to move on to the wiring..
Thanks for following, David