A few more updates. The floor is finished and I framed the front wall. The bottom will be the headboard and the top will be cabinets. I am going to put a cabinet bottom just below the cross piece. The area below that will be dead space.

I also started working on the rear. This bench will be storage on the right with a hinged seat. The left will be for battery and electronic connections and my 12v charger/converter.
The bench is perfect for my wife. I am too tall for it. They way I am planning my indoor/outdoor table will allow me to sit on the bed. It should work but if not I'm adapting as I go. I am debating the rear access hatch. I think it could be useful but I don't know if the value is actually there.
They layout and design will make more sense as it unfolds. It's in my head with daily revisions at this point.

If you look close you will notice a large gap on the white plywood. This piece was already this width and I decided to use it hoping a piece of molding will cover the gap. It was a large piece of wood that I wanted to be able to use so I went for it. It's glued and Brad nailed in place now so one way or another it is going to work.




I have a deadline of 1Mar to be able to use it. My wife is going to volunteer at the Charleston marathon I am running in 2 weeks (1/2 marathon for me). This will grant her credit for the Myrtle Beach marathon on 2Mar. I made camping reservations already so I need to meet that target date.
At this point I am planning to have the exterior complete for weather reasons and after that my bed and climateright are the only other must haves. I hope to have some lighting done but cabinet door and trim work and many many little things probably won't be completed yet.
The doors still frighten me but my hinges are not hear yet so I just stare at them in fear.
Sent from my iPhone using Tapatalk