2021-05-31
Well I had hoped to get more accomplished over the long weekend but seemed like one of those weekends where everything takes longer than you expect. I don’t even have a ton of progress photos to present. Friday evening I put some of the finishing touches on the skeletons and insulated them both with 3/4” XPS foam board. I only had a half day to work Saturday. I was able to get the exterior skins cut and for both walls. I used the skeleton as a template for the exterior skins. Once the skins were cut, I used the router and a guide to remove the spar rail. Sunday I glued up the exterior skins and skeleton. I must say, this was a stressful process trying to beat out the open time of the glue. Once I had a system down it wasn’t so bad but I was sweating through the first few pieces. Today I was able to glue up the interior skins. The 1/8” birch was much easier to work with than the 1/4” exterior ply. I only had enough clamps and heavy items for one wall at a time. While I was waiting for glue to set up I was able to wrap up some odds and ends on the trailer. I cut a crossmember for the Timbren suspension, wired the brakes up and bolted the floor down. I only snapped one post worthy photo and it was of my “assembly line”. The pop up tent sure helped to keep the sun off me and the glue as I was spreading it out.

Tomorrow I’ll be trimming the interior skins down and chiseling all the excess glue left behind before flush trimming the profile and dado slots. With a little luck from the weather, I’m hoping to be putting walls up by next weekend.