I have rounded up three 100W 12V panels and a 30 Amp charge controller for my CTC. I plan to mount the panels semi-permanently on the roof and wire them in parallel to the charge controller. I have looked online for instructions and found some that suggest you need to include a diode in series with each panel, while others don't mention this. My charge controller only has one input (one +ve and one -ve terminal) for the panels so I will need to wire the parallel panel circuits to a single lead to the controller. If any of you have done this before, I would appreciate any tips or recommendations on how to connect the panels, wire gauge for each parallel loop and the main lead to the controller, good terminal connectors that would allow me to unplug individual panels if I have any need to, the need for diodes and anything else that I may not have realized yet

Best regards,
Kevin