SteveH wrote:Only thing even potentially bad that I can see is that it creates a place for water to accumulate and possibly soak into the plywood wall.
BrianB wrote:How about this. If you want to cover the frame like I do, weld on a lip the same width as the thickness of your plywood onto the bottom of the frame. Do it so that it supports the edge of the plywood so that you can screw the plywood into both the frame AND floor without the shear loading issues.![]()
Mikedaub wrote:I'm glad I keep coming back to this forum because of all of the help.
Finally my summer is starting to calm down a bit and I am able to start back on building this guy. Rain all season in New England has me building everything in my basement, and piecing it together. Well, the rain has stopped, and its time.
When I thought about putting the walls on, I never thought about load weight of the build and after reading some of this post, I am concerned. Here is the way I was planning on doing it, Sorry for the bad photoshop skills.
So, I have the floor down, then was going to put the wall even with the bottom of the frame so it covered it and secured them together with the 1x2 strapping that is glued and screwed. For extra measures, I was also going to bolt the walls to the frame in about 3-4 different spots. Hopefully that makes sense.
With the strapping and bolts, think that will be strong enough?? For the most part, I used 15/32 pine ply and 1x2 pine straps.
Thanks in advance..
Return to Teardrop Construction Tips & Techniques
Users browsing this forum: No registered users and 8 guests