With windows coming Tuesday I feel the 4th quarter press coming on!
>I need more veneer, but not here till mid August.. Oh well, some cabinets fronts are FG panel only. I can live with that
>Ordered the balance of my electrical needs, which are actually fairly small. I'm missing my two USB/12v charge panels and coming by Monday. Some additional wiring for who knows what.. But ready
>Plumbing I found I don't have on hand what I need and will get tomorrow at that Box Store I so despise.. My local Ace doesn't have what I need.. Water pickup worked, and drain work fantastic! Now the right tubing to fit it all..
>Counters fitted and ready. I mean both sides! Lift top over frig ready for install and the lift table built, I need to design/make the leg. I'll get into that at some point..
>Balance of wall panels need to be cut. I'm templating and fitting, so once the windows are here most of the work is done. Or so I hope...
>Ceiling.. This is an ongoing battle.. I don't like blocking out all the light, yet don't want all that light or heat transference.. I think I have a solution and may sound deaden a bit. Ongoing process on the ceiling.. Another point I'll get to.
Hard week and a half coming, but I'm up for it!

What's life without a Challenge or two?
Plan on traveling, having a beverage or three and relaxing on a run soon!